Passenger flow
Describe expected traffic, travel direction and how the system connects with circulation routes in the building.

High-traffic inclined and horizontal transport
Escalator and moving-walk systems engineered for malls, metros, airports, hospitals, business centers and pedestrian crossings.
Project planning
Escalators and moving walkways must suit passenger flow, building geometry and the intended use. AKE reviews the project country and site information before system selection and supply scope are defined.
Describe expected traffic, travel direction and how the system connects with circulation routes in the building.
Share rise, inclination, available length and width, and any known structural constraints at the proposed location.
State the country, building type, indoor or outdoor environment, project stage and requested assessment scope.
Building type, passenger flow, rise, available dimensions, operating environment and project stage provide the starting information.
That depends on route geometry, inclination, movement needs and the building concept, so the project conditions must be reviewed.
AKE reviews the intended use, installation conditions and requested scope. The configuration is then developed for the specific project.
AKE escalators and moving walkways are planned by calculating building traffic, load capacity, unit rise, travel distance and incline angle together. Outdoor applications are evaluated with durable corrosion-resistant materials, glass or stainless-steel balustrade options and after-sales support.
The published AKE catalogue presents escalators and moving walkways in separate technical tables. The angles and widths added below are options for each product family. They are not confirmed specifications for every C, P or T model. Selection requires the current model drawing, rise, travel distance and expected passenger flow to be assessed together.
Escalator and moving-walkway technical tables, catalogue pages 12–13 (PDF)

For an existing installation, compare the project requirements with escalator modernisation before deciding on the scope of renewal.
For an existing installation, prepare an enquiry about elevator and escalator service and maintenance using the model, location, operating history and observed fault.
To support an initial product comparison, consult the AKE product catalogues and confirm that the document and revision apply to your project.
They are evaluated for high-traffic spaces such as malls, business and event centers, airports, metros, hospitals and pedestrian crossings.
Unit rise, travel distance, building traffic, load capacity and standard 30 or 35 degree incline angles are calculated together.
Yes. Durable corrosion-resistant materials and suitable balustrade options are evaluated for outdoor use.
AKE clarifies site conditions, traffic calculation and quotation steps with engineering support.